



Main Engines N.2 MAN V12-116 SOHP +2F pod propeller Max speed at half load 27 Kn Cruise speed at half load 23 Kn Fuel tank capacity 8.500l Fresh water tank capacity 1.300l Owners and guests accomodation 8+2 Crew accomodation 2 The interior and exterior layouts will be according to the general plan. The description of the materials given in this specification is the basic decoration included in the contract. All appliances, TV and stereo equipment, air conditioning and ventilation equipment, light fixtures, alarm and fire detectors, electrical panels, etc. will be integrated in the interior design. 13.2 Floor covering Carpet will be fitted in ownerโs suite, ownerโs dressing, guest cabins, corridor. All carpets will have acoustic underlay. All edges of carpet will be bound, where necessary, or fixed under the furniture. Parquet floors will be fitted in Ownerโs bathroom, guestsโ bathroom. Shower floors will have drip pan with varnished teak grating on top. 13.3 Wall finishing Walls will be finished in wood selected within the range of woods normally used in the yachting industry (teak, oak, cherry, tanganika, mahogany, or equivalent). Limited area could be upholstered with fabric or leather. Lacquered panels can be fitted on bathrooms and galley walls.
54 common.items
0 common.options